ScheduleOnDates​Schedule​On​Dates

ScheduleOnDates ScheduleOnDates

yaml
type: "io.kestra.plugin.core.trigger.ScheduleOnDates"

Schedule a flow on specific dates.

Properties

dates

  • Type: array
  • SubType: string
  • Dynamic: ✔️
  • Required: ✔️

conditions

  • Type: array
  • SubType: Condition
  • Dynamic:
  • Required:

List of conditions in order to limit the flow trigger.

inputs

  • Type: object
  • Dynamic: ✔️
  • Required:

The inputs to pass to the scheduled flow.

recoverMissedSchedules

  • Type: string
  • Dynamic:
  • Required:
  • Possible Values:
    • LAST
    • NONE
    • ALL

What to do in case of missed schedules

ALL will recover all missed schedules, LAST will only recovered the last missing one, NONE will not recover any missing schedule. The default is ALL unless a different value is configured using the global plugin configuration.

stopAfter

  • Type: array
  • SubType: string
  • Dynamic:
  • Required:

List of execution states after which a trigger should be stopped (a.k.a. disabled).

timezone

  • Type: string
  • Dynamic: ✔️
  • Required:
  • Default: Etc/UTC

The time zone identifier (i.e. the second column in the Wikipedia table) to use for evaluating the cron expression. Default value is the server default zone ID.

Was this page helpful?